DFSS Suplement

Problems in the form of defects and waste are solved using DMAIC (Six Sigma) and Lean respectively. Most often than not these problems are surfaced because of the seeds of the problems were available during the creation stage. These happen because of either we don’t recognize the multiplicity of host of stakeholders or their requirements or poor focus on updated technologies or both. If these issues are taken up comprehensively in the design stage, then quantum and extent of defect and waste related problems can be minimised dramatically.

Objective of the program is to orient the process of development of the product or process or system or service in such way that defect and waste can be prevented from the very introduction or birth time. This is designed to augment existing Six Sigma Project Leaders (Black belts) with necessary skills for identifying and leading projects of DFSS category.

Program Benefits

The participants will acquire the knowledge and awareness on

  • Approaches and tools
  • Case studies of different type of designs
  • Relating the knowledge to their respective product/ process/ system or service designs.

Pre-requisites

Certified Black-belts who have successfully completed at-least one Six Sigma Project using DMAIC methodology can benefit from the this training.

Certification

Certification will be issued after successful qualification in the test conducted on the last day of the training.

Course Content

Phase

Topics

Introduction


Recognition

BLD, Project Hopper, Project Prioritisation matrix

Define

MGAP, Project Charter, Risk Mitigation Plan, Feasibility Study, VoC, Affinity Diagram, Tree Diagram, Contextual Enquiry, Conjoint Analysis

Measure

QFD, Process Capability, Simulation, Design Score Card

Analysis

Fault Tree Analysis, DFMEA, P-R Map, PD FMEA, P FMEA, TRIZ, Pugh Matrix, DFX, Axiomatic design, Tolerance design, Faulty tree analysis, Reliability

Design

Design score card, High level design, Detailed design, Control plan

Verify

Commissioning, Control plan filled in with data